Drill safety regulations

【China Deep Hole Rig Trading Network】
1. The drilling site should be kept clean.
2. When installing and disassembling the drilling rig, ensure that it is correct and complete.
3. The operator should stand in a safe position when the boring bar of the rig moves up and down.
4. When starting the motor, all friction clutches of the rig should be turned on.
5. When the rig is working, it is forbidden to remove the protective cover.
6. Before starting the work, the reliability of the braking device and the performance of the friction clutch and the starting device should be checked.
7. It is forbidden to inspect the rig before the motor is stopped.
8. It is forbidden to tighten any part of the drilling rig when the rig is in operation.
9. When the rig is running, refueling is strictly prohibited. The upper mast of the mast should be refueled when the rig is stopped.
10. It is not allowed to work on the mast before the motor has stopped.
11. In any case, when someone in the upper section of the mast is working, no other person is allowed under the mast.
12. In case of bad weather (storm, heavy snow, ice, or strong winds above level 5), [1] Do not work on masts. At the same time, artificial lighting is not allowed to work on masts.
13. Do not use cracked steel wire ropes.
14. It is strictly forbidden to touch the wire rope when drilling tools are moving up and down.
15. In addition to lifting and downhole drilling rigs, the wellhead is strictly prohibited.
16. In order to prevent the drilling tool or sucker from being thrown out of the well after it is removed from the well, it must be hooked with a hook made of a 15-20 mm diameter steel bar.
17. When cleaning the canister, use a sturdy and reliable steel wire rope to form a loop, put it on the lower end of the canister and turn it upside down.
18. When lifting or lowering the casing with a pulley, and when the machine is working in salvage, all workers should leave the well.
19. When using the jack to pull out the casing, in order to prevent the casing from falling off, they must be fixed to each other.
20. When the lighting is stopped (at night), the drilling work should stop. When the drill is still in the well, it should be carefully removed from the well.
[Chinese deep hole drilling rig trading network http://skzj.99114.com/]

Curtain Eyelet

Curtain Eyelet,Square Shape Curtain Eyelet,Curtain Rod Eyelet,Heart Pattern Curtain Eyelet

Shaoxing Fuli Import&Export Co.,Ltd , https://www.fulicurtainaccessories.com