Comparison and selection of several gold gold equipment

This article briefly describes what the gold sand election equipment.

The equipment of the gold mine is nothing more than the following: fixed chute, peristaltic chute, round jig, shaker. Which one do you want to use? It depends on the situation.

Fixed chute, made of simple sticky gold grass, simple or even maintenance-free, most widely used, almost all small sand gold mines are used, but the effect is the worst, and the resulting loss is an astronomical number. .

Creeping chute, the cost is higher than the fixed chute, but the selection rate is much better than the fixed chute, generally more than 92%. But maintenance is a bit more complicated. Its characteristics are: the amount of sand discharged from the fixed chute, the selection rate of the jig shaker, I think this should be the most ideal equipment for the gold mine.

The round jig, the selection rate is slightly better than the creeping chute, but the cost maintenance is many times higher than the agitating chute, and the small and medium-sized mine can not bear it. This jig has a complicated structure, high cost, complicated maintenance, requires professional service, large volume and heavy weight (generally tens of tons of weight), can only be used in large mines, and small and medium-sized mines cannot withstand the industry. As for the simple trapezoidal jump, the recycling effect is almost the same as that of the fixed chute, and the amount of sand is small, the amount of concentrate is large, and there is no practical use value.

The shaker is the best selection of these equipments, and the price is not expensive, but its sediment output is too small, it can only be used for the treatment of concentrates, and there is nothing to do with the treatment of coarse ore.

According to the statistics of various parties and my own years of experience, the selection rate of the creeping chute, jig and shaker is basically the same, which is more than 10% higher than the ordinary fixed chute. Although the investment is relatively large at the beginning, the fixed chute is lost. Gold, the accumulation of losses will be an astonishing number, 10 times or even 100 times the cost of equipment.

The figure below is a comparison of several devices.

Compared with several gold selection equipments, the gold mine should be equipped with a “fixed chute + peristal chute” configuration. The front end uses a 3m fixed chute and then a series of peristaltic chutes. Because the link between the creeping chute and the sieve requires a short sink and a short sink. The gold felt is a fixed chute, killing two birds with one stone. I strongly oppose the use of a single gold mine with a fixed chute, which is both ruining itself and ruining natural resources. A simple example is a small mine with a daily output of 500 tons of sand (200 cubic meters, 50 loaders with about 70 shovel), with a fixed chute (15m long) to recover 50g of gold per day, and with our recommended combination process, increase the selection rate. At least 10% or more. On the other hand, this short and precise mining and selection system has many benefits for energy saving. The system is small in size, small in footprint, easy to move, and more importantly, greatly reduces the height of the table and reduces the feed water supply. The cost, the crude material up to the slide, is converted into diesel oil, which is about 10ml~30ml/tonm. At the same time, the water consumption of the creeping chute is slightly smaller than that of the fixed chute, which can also save a little pumping cost. The production time of gold mines is very limited, coupled with equipment failure and maintenance time, and the actual production time is indeed very limited. In the north, we only have 5 months of production time per year, and each day is prime time. However, the daily chute work, a lot of delays, such as the mine, 15m long fixed chute, clean up again, at least 2 people spend 1 to 1.5 hours, a little wasted time. The cleaning chute of the creeping chute works as long as one person takes 10 minutes.

Is the use of the peristaltic chute complicated to maintain? Is there a high failure rate?

The use of the creeping chute is easy to maintain. It can be used alone or in series with a fixed chute. It can be connected to the power supply, and it is not much different from the installation of the fixed chute. The most difficult thing is to change the rubber bottom at the very least (3 to 6 months for a single layer, 100 yuan for a rubber. Double-layer thickening for one to two years), two unskilled workers Use 2, 3 hours.

For the treatment of concentrates, I recommend the use of our high-grade shaker specially developed for the gold mine. If not, use a peristaltic chute for secondary concentration and then shake manually or with a shaker. All manual manual selection is just a matter of necessity.

Let us compare the investment costs.

If you want a better recovery rate for a fixed chute, use a long slot. For a small mine of 500 tons, use a gold felt tank with a length of 0.8 meters and a length of 15 meters. At least 17 meters of gold felt should be used. According to the current market price, it is necessary to make 6000 yuan. This tank is about 3,000 yuan. The gold felt is replaced by the longest 4, 5 months, and the daily cost of the gold felt is 50 yuan / day. The installation angle is generally at least 13 degrees, which requires about 3 meters of drop, which inevitably raises the height of the table, increases the height of the feed, and increases the cost accordingly. (You can estimate it yourself. The relationship between height and fuel consumption is generally 10 to 30 ml of diesel/ Tons of meters), but also have a large enough venue. To install such a chute, you need to choose a field, trim a 16-meter-long 13-degree ramp, and build a very large slide. Although it is rough, inexperienced people are not easy to do it. It is a huge workload. The cost is not small, and the turret is often moved and moves with the mine. For each clearing, three people, on average, need at least 30 minutes. The amount of concentrate is about 0.8*15*0.02=0.25 cubic meters (250 liters, 600kg).

The creeping chute has a length of only 4 meters and the recovery rate is higher than that of the 15m gold felt. The mine can be used with a GL-900. The water consumption is 20%~30% smaller than the fixed tank. The angle can be selected between 5 and 15 degrees (depending on how much water is determined, the amount of water is large, the angle is small, and the amount of water is increased), the drop is only twenty or thirty centimeters, and the price is 15,000 yuan. Power consumption is 0.3 degrees / hour, converted to diesel generators, only 60 grams / hour of fuel consumption, 1.3 liters of oil a day is enough. Change rubber for 3 months, the price is 100 yuan. Install a creeping chute, as long as the slope of 4 meters long, the angle adjustment is very convenient, you can use a stone pad, it is very simple. It takes only one person to clear the tank at a time, it takes 5 to 10 minutes, and the amount of concentrate is about 0.03*2.5*0.9=0.07 cubic meters (70 liters, 200kg). My gold mine is this joint beneficiation process, as shown below, the system is compact and efficient.

Round jig or jig, not to mention, the price is scary, install exhausted people, use troublesome people.